WH(Y) Decision Statement

In the context of building unsorry — a distributed swarm of autonomous AI agents producing kernel-verified Lean 4 proofs — from a pre-Phase-0 repository up to its Gate A contributor-readiness milestone, facing the need for every decision and change to be auditable and machine-checkable before untrusted public contributors are invited into a project whose entire safety argument is “machine-checked gates, not goodwill”, we decided for adopting the cgbarlow development protocols, vendored verbatim at docs/protocols.md, as binding for all unsorry development (core protocols 1–12; optional protocol 13 does not apply), and neglected an ad-hoc process, a bespoke process invented for this project, and heavyweight enterprise frameworks such as TOGAF-style governance, to achieve a complete paper trail for every significant decision (ADRs), living implementation detail (specs), test-first correctness discipline (TDD), reviewable change history (feature branches, no direct commits to main), traceable releases (Keep a Changelog, semver, tagged GitHub releases), and a README that tracks reality — all in place before strangers arrive, accepting that every change, however small, carries process overhead (branch, PR, ADR, spec, changelog), and that the vendored protocol copy can drift from its upstream source and must be re-vendored deliberately.

Context

unsorry is a self-coordinating research swarm for formal mathematics: autonomous agents claim open goals (Lean statements carrying a sorry), attempt proofs, verify them locally against the Lean kernel, and merge them into a shared machine-verified library with no human in the correctness path. The design (see docs/proposals/distributed-research-swarm-plan.md) rests on three commitments: the kernel is the only truth oracle, the repository is the only infrastructure, and coordination artifacts are machine-validated rather than prose.

At the time of this decision the repository is pre-Phase-0 — it consists of two markdown files, the README and the design proposal. It is being built up to its Gate A contributor-readiness milestone, after which untrusted public contributors (human and agent alike) are invited to claim goals and open pull requests, with CI gates rather than human review deciding what merges.

A project that asks contributors to trust machine-checked gates rather than maintainer goodwill cannot credibly govern its own construction by informal habit. The same trust-through-verification ethos that shapes the swarm architecture applies to the development of the swarm itself: decisions must be recorded, alternatives must be visible, changes must arrive through reviewable branches, and releases must be versioned and traceable. Adopting an established, written protocol set gives every decision a paper trail before the first stranger arrives.

The protocols adopted are the cgbarlow development protocols, vendored verbatim at docs/protocols.md. Core protocols 1–12 are binding: ADRs for every significant decision (in this format), a spec for every implementation ADR, TDD, feature branches with no direct commits to main, Keep-a-Changelog plus semantic versioning plus tagged GitHub releases, Context7 for language research, production-ready code only (no mocks or stubs in application code), Claude agent teams for parallelisable work, latest stable dependencies, README accuracy, and DRY. The README currently says “pre-Phase-0” honestly; protocol 11 obliges it to keep tracking reality as phases land. Optional protocol 13 (Svelte {@html} security) is conditional on the project using Svelte; unsorry contains no Svelte, so it does not apply.

Options Considered

Option 1: Adopt the cgbarlow development protocols, vendored verbatim (Selected)

Option 2: Ad-hoc process (Rejected)

No written process; the maintainers commit as convenient and document when it seems worthwhile. Rejected because it leaves no decision trail — exactly the audit gap that becomes untenable once untrusted contributors arrive — and because it directly contradicts the project’s own trust-through-verification ethos. A project arguing that goodwill is insufficient for proof contributions cannot rely on goodwill for its own governance.

Option 3: Invent a bespoke process for this project (Rejected)

Write a new, unsorry-specific development process from scratch. Rejected because it duplicates a proven, already-documented protocol set with no offsetting benefit — a violation of DRY applied to process. The effort of authoring, debugging, and socialising a novel process is better spent on the swarm itself.

Option 4: Heavyweight enterprise framework (Rejected)

Adopt a formal enterprise architecture governance framework (TOGAF-style architecture boards, formal review cycles, stage gates). Rejected because the ceremony would slow a fast-moving pre-1.0 project out of proportion to its risk profile. The vendored protocols deliver the auditability that matters (decision records, reviewable changes, versioned releases) without standing committees or multi-stage approval queues.

Dependencies

Relationship ADR ID Title Notes
Enables ADR-002 Lean 4 + mathlib4 Pinned to Release Tags Dependency-management decision made under these protocols
Enables ADR-003 AISP Coordination Format with In-Repo Validation Coordination-format decision made under these protocols
Enables ADR-004 Claims on a Dedicated Branch, First-Push-Wins Claim-mechanism decision made under these protocols
Enables ADR-005 Autonomous Merge Policy Merge-policy decision made under these protocols

References

Reference ID Title Type Location
REF-001 Distributed Autonomous Research Swarm: Architecture and Plan Design document docs/proposals/distributed-research-swarm-plan.md
REF-002 Development Protocols (vendored verbatim) Protocol set docs/protocols.md
REF-003 Keep a Changelog External standard https://keepachangelog.com/
REF-004 Semantic Versioning External standard https://semver.org/

This ADR is a process decision and carries no implementation of its own; per protocol 2, specs accompany implementation ADRs, and each such spec lands with its implementation PR.