Context

A prove goal carries an affinity score (⟦Γ:Affinity⟧, ADR-010). select_prove_candidates ranks the claimable pool and _rank drops everything with affinity < TAU_V (−5) as “below viability — awaiting re-decomposition.” A failed prove attempt demotes a goal by −10 (demote_goal), so a goal that fails its first claim’s attempt ladder drops from 0 to −10 in one step — below the floor — and select_prove_candidates can never surface it again.

The intended recovery (ADR-009) is decomposition into sub-lemmas, but decomposition only fires at failure-time inside prove_goal. If that one decomposition does not happen (decompose disabled, the provider produced no usable split, the depth cap, or simply a run that demoted instead of decomposing), the goal is orphaned: parked below the floor, no sub-lemmas, and nothing ever revisits it. ADR-024 cross-cycle lesson memory records a ⟦Δ:Lesson⟧ for each failed attempt, but lessons are only injected when a goal is re-selected for proving — which never happens for a parked goal.

Observed on main (2026-06-15): of 58 phase=prove, status=open goals, 48 were parked below TAU_V (46 at −10, 2 at −20) with no decomposition, while the 10 viable ones all had open prove PRs in flight. The swarm reported “nothing claimable” despite 48 open, recoverable goals — and prove --once runs exited immediately. The pool was starved.

WH(Y) Decision Statement

In the context of a prove queue that drops goals below TAU_V and only ever decomposes a goal at failure-time, while ADR-024 now carries each failed attempt’s lesson forward so a re-attempt need not start from an empty board, facing the fact that a goal demoted to −10 on its first failed claim is parked below the floor with no decomposition and no path back — never re-selected, its accumulated lessons never reused — so the working pool drains to “only in-flight goals remain” and the swarm idles while dozens of open goals sit recoverable, we decided for an idle recovery pass: when a --prove cycle finds no claimable viable goal, re-surface one goal parked below TAU_V (the recovery-candidates selector — the exact inverse of prove-candidates, least-buried first) and run it through the same prove_goal pipeline, which retries with its lessons injected (ADR-024) and decomposes on failure (ADR-009) — no duplicated recovery logic, just a second source for the existing claim+work step (UNSORRY_RECOVERY=0 disables it), and neglected a dedicated re-decomposition sweep that splits parked goals directly (rejected — it duplicates prove_goal’s decompose path and skips the cheaper retry-with-lessons stage the maintainer specifically wanted first), lowering/removing TAU_V so parked goals stay in the normal queue (rejected — the floor’s whole purpose is to keep the normal queue focused on viable work; recovery is the explicit, idle-only exception), and re-promoting parked goals’ affinity in place (rejected — it loses the “these already failed once” signal and lets a hard goal crowd the viable queue every cycle), to achieve a swarm that, instead of idling, spends an otherwise-empty prove cycle giving an orphaned goal a lessons-armed retry and then a decomposition — so the pool keeps making progress until goals are genuinely proved or split, accepting that a recovered goal that fails again is demoted further (−20, …) and the next idle pass takes the next-least-buried goal (bounded: one recovery goal per cycle, HANDLED prevents repeats within a session, and live-claim filtering avoids two agents recovering the same goal), and that recovery deliberately runs only when no viable work exists, so it never competes with normal proving.

Consequences

References

Reference ID Title Type Location
REF-1 Recovery spec Specification specs/SPEC-044-A-Idle-Recovery-Of-Parked-Goals.md
REF-2 Affinity ranking & viability floor ADR ADR-010-Affinity-Gap-Selection.md
REF-3 Decomposition on prove failure ADR ADR-009-Goal-Decomposition.md
REF-4 Cross-cycle lesson memory ADR ADR-024-Cross-Cycle-Lesson-Memory.md
REF-5 Claim released at PR-open (in-flight skip) ADR ADR-017-Swarm-Supervisor.md

Status History

Status Approver Date
Proposed unsorry maintainers 2026-06-15
Accepted unsorry maintainers 2026-06-15